SOURCE-LINKED U.S. REGISTRY

Maquoketa Industrial Park Data Center Campus

Undisclosed developer · Maquoketa, IA · United States

Facility record

Lifecycle
CancelledSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
42.05, -90.665
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-29

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    An unnamed company plans a small- to mid-sized campus on a 46-acre city industrial park parcel off Highway 61, south of Maquoketa. It is in the pre-development stage.

    Underlying source
  2. Cancelled

    Maquoketa and development consultant Gronen mutually ended preliminary data center talks for the Highway 61 Industrial Park site on Aug. 17-18, 2026. The city says the halt may be temporary and the park could still host a data center later.

    Underlying source

Source notes

Parcel could sell for about $1.15M. The developer is not requesting incentives and will cover infrastructure upgrades. No end user yet, and the site will not be used for crypto. The developer has not been publicly identified.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory