Maquoketa Industrial Park Data Center Campus
Undisclosed developer · Maquoketa, IA · United States
Facility record
- Lifecycle
- CancelledSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 42.05, -90.665
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-29
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
An unnamed company plans a small- to mid-sized campus on a 46-acre city industrial park parcel off Highway 61, south of Maquoketa. It is in the pre-development stage.
Underlying source - Cancelled
Maquoketa and development consultant Gronen mutually ended preliminary data center talks for the Highway 61 Industrial Park site on Aug. 17-18, 2026. The city says the halt may be temporary and the park could still host a data center later.
Underlying source
Source notes
Parcel could sell for about $1.15M. The developer is not requesting incentives and will cover infrastructure upgrades. No end user yet, and the site will not be used for crypto. The developer has not been publicly identified.
Sources and provenance
- 46-acre data center campus planned in Maquoketa, Iowa · source retrieved 2026-10-28
- Maquoketa halts early discussions on potential data center development · source retrieved 2026-10-29
- Data center talks end · source retrieved 2026-10-29
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.