Site MAT 1177
MARA Holdings · , TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 28.95, -95.97
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1000 MW
- Source record updated
- 2026-07-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Grid capacity milestones Oct 2027 / Apr 2028.
Underlying source
Source notes
~1,200 acres approximately 90 miles SW of Houston; up to 2,000MW long-term. Coordinates are a COUNTY-CENTROID approximation — exact city undisclosed.
Sources and provenance
- MARA signs agreement with HIF to acquire strategic powered land site · source retrieved 2026-07-17
- Marathon Digital Holdings $600M Texas AI-bitcoin campus · source retrieved 2026-07-17
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.