Limerick Township Data Center Campus (MCD 7)
MCD 7 LLC · Limerick Township, PA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.2447, -75.573
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 750 MW
- Source record updated
- 2026-09-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Limerick Township planning commission received a first look at the 1.4 million sq ft, eight-building proposal.
Underlying source
Source notes
Eight server buildings totaling about 1.4 million sq ft on roughly 192 acres across from the Philadelphia Premium Outlets, replacing a previously approved warehouse complex; projected to generate $10–20 million in tax revenue, primarily to the Spring-Ford School District. Trade press reports the project under the name 'Project Laurel' and places it within a mile of Constellation's Limerick nuclear station; neither detail was confirmed in the source cited here. The eventual occupant is under a non-disclosure agreement.
Sources and provenance
- Limerick gets first look at 1.4M-square-foot data center proposal · source retrieved 2026-08-17
- Limerick Board of Supervisors vote to send a letter opposing a land swap for proposed data center · source retrieved 2026-09-10
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.