Menlo Digital MD-SV1 (888–894 Ross Drive)
Menlo Equities / Menlo Digital (Sunnyvale Technology Partners LLC) · Sunnyvale, CA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 888 Ross Drive
- Coordinates
- 37.4009443, -122.0324832
- Serving utility, source-reported
- Pacific Gas and Electric Company
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 49 MW
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
CPUC approved (with modifications) PG&E's agreement to energize a 49 MW data center and computing lab at 888 Ross Drive; Menlo Equities proposed a June 2027 operation date. Site was previously entitled for an office/life-science campus.
Underlying source
Source notes
Two-story ~244,214 sq ft building with six data halls on an 8.9-acre Peery Park site; 49 MW secured power / 36 MW critical IT per Menlo Digital. Distinct from Menlo Equities' 300 Holger Way and Great Oaks Parkway proposals in San José.
Transmission-level interconnection with on-site substation; CPUC Resolution E-5433 limits energization-cost refunds to 75% of net revenues over 15 years.
Sources and provenance
- CPUC Resolution E-5433 (2026-03-19): PG&E exceptional-case transmission interconnection for Sunnyvale Technology Partners LLC c/o Menlo Equities — 49 MW data center and computing lab at 888 Ross Drive · source retrieved 2026-09-21
- Menlo Digital — MD-SV1 (Sunnyvale) portfolio page · source retrieved 2026-09-21
- Menlo Equities pivots entitled Sunnyvale office site to 49MW, 244,000 SQFT data center in Peery Park (2026-06-17) · source retrieved 2026-09-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.