300 Holger Way Data Center (Menlo Equities conversion)
Menlo Equities (Holger Technology Partners LLC) · San Jose, CA · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 300 Holger Way
- Coordinates
- 37.4183407, -121.9466942
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
City of San José filed a CEQA Notice of Exemption (Class 32 infill) for a Special Use Permit allowing data center use within the existing ~97,800 sq ft R&D building on a 4.86-acre site; The Real Deal reported city approval of the Menlo Equities office-to-data-center conversion in July 2026.
Underlying source
Source notes
Conversion of an existing ~97,800 sq ft research-and-development building in North San José to data center use (SUP SP25-029). Capacity not stated in the exemption notice.
Sources and provenance
- CEQAnet SCH 2026070652 — SP25-029 / ER25-243 300 Holger Way Data Center Project, Notice of Exemption (posted 2026-07-16) · source retrieved 2026-09-21
- Tishman Speyer grabs Santa Clara land entitled for data center for $65M (2026-07-29) · source retrieved 2026-09-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.