SOURCE-LINKED U.S. REGISTRY

5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive)

Menlo Equities · San Jose, CA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
5601 Great Oaks Parkway
Coordinates
37.2503404, -121.7944434
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
100 MW
Source record updated
2026-09-21

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Special Use Permit SP26-022 (pending intake on the city's July 2026 list) for a 444,436 sq ft data center with on-site substation and publicly accessible open space on a portion of Western Digital's South San José campus along Charlotte Drive; ~100 MW at full build per The Real Deal.

    Underlying source

Source notes

Proposed on Charlotte Drive between Lexington Avenue and Raleigh Road, industrial-zoned land within Western Digital's tech campus; The Real Deal reports the project would require nearly 100 MW once complete. Coordinates are a street-level geocode of Great Oaks Parkway (approximate).

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory