SOURCE-LINKED U.S. REGISTRY

Menomonie Data Center Campus

Undisclosed (Balloonist LLC) · Menomonie, WI · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
44.8769, -91.9193
Serving utility, source-reported
Xcel Energy
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Balloonist LLC filed an annexation petition and I-1 rezoning for a ~324-acre site on County Highway B (Town of Red Cedar)

    Underlying source
  2. Proposed

    Menomonie City Council approved annexation and I-1 rezoning 8-3; rezoning is not a building permit

    Underlying source
  3. Proposed

    Mayor Knaack declared the project 'on pause'; TID/development-agreement talks ended; Balloonist subsequently purchased the land

    Underlying source
  4. Proposed

    City Council adopted a new I-4 Data Center Industrial District ordinance with stricter parameters, effectively requiring Balloonist to reapply

    Underlying source
  5. Proposed

    Mayor Crowe: city still refining the I-4 ordinance, draft to be introduced Aug 3 2026; Balloonist retains the land

    Underlying source

Source notes

End operator undisclosed behind Balloonist LLC (a Delaware foreign LLC). Multiple outlets note Balloonist's Delaware address and registered agent match prior Meta data-center SPV patterns, but no source names Meta or any operator - recorded as undisclosed. A council member said the end user is 'one of the top tech giants' without naming them. The record is listed as proposed rather than permitted: the original I-1 rezoning was superseded by a January 2026 I-4 ordinance; no building permits were ever issued. Proposed investment up to $1.6B and 50-75 FTE jobs are developer projections (not recorded as firm fields). No MW capacity disclosed. Site: ~324 acres along County Highway B (annexed from Town of Red Cedar Aug 2025). Coordinates are the Menomonie centroid. The likely AI-specific classification rests on hyperscale scale + 'tech giant' attribution, not an explicit AI-workload statement.

Balloonist LLC confirmed working with Xcel Energy and the WI Public Service Commission on supply/grid; no MW load or substation figure disclosed.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory