SOURCE-LINKED U.S. REGISTRY

Meta Aiken Data Center

Meta · Graniteville, SC · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.5629, -81.8287
Serving utility, source-reported
Aiken Electric Cooperative
Operational capacity, source-reported
Not published
Planned capacity, source-reported
200 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Meta publicly announced Aiken County data center campus, 22nd US data center

    Underlying source
  2. Under construction

    DPR Construction leading build; Governor McMaster attended groundbreaking ceremony

    Underlying source

Source notes

Sage Mill Industrial Park, Graniteville. 715,000 sq ft; Meta's 22nd US data center. Explicitly optimized for AI workloads. Administration building constructed with mass timber. Expected operational spring 2027. Coordinates are Graniteville area centroid. On subsidies: in April 2023 Aiken County Council approved, 7-2, a fee-in-lieu-of-tax agreement and a joint multi-county business/industrial park with Edgefield County for the then code-named 'Project Sabal' (intermediary Starskey LLC), reported by the Aiken Standard; a September 2024 Aiken Standard column reports that the fee-in-lieu agreement between Meta and Aiken County runs for 40 years. No dollar value or ordinance number was found, so the subsidy entry carries no amount.

Meta working with Aiken Electric Cooperative to add new renewable energy to the grid for the facility

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory