SOURCE-LINKED U.S. REGISTRY

Meta Fort Worth Data Center

Meta · Fort Worth, TX · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
32.9844048, -97.2617581
Serving utility, source-reported
Oncor
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-09-21

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Broke ground 2015, began serving traffic 2017; ~200-acre campus, expanded since.

    Underlying source

Source notes

Meta (Facebook) data center at 4500 Like Way, Fort Worth, Tarrant County (near TX-170 and Park Vista Blvd) — broke ground 2015, began serving traffic in 2017, on a ~200-acre campus, heavily expanded since (with an announced AI-driven expansion). DISTINCT from Meta's tracked El Paso, TX campus. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Like Way address; a county-parcel pass could upgrade precision to exact.

Facebook/Meta signed a 2015 PPA for the 200 MW Shannon Wind Farm in Clay County, TX (~90 mi from the site) specifically to power the new Fort Worth data center; the project delivers via an Oncor Electric Delivery substation.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory