Meta Gallatin Data Center Campus
Meta · Gallatin, TN · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 36.3884, -86.4369
- Serving utility, source-reported
- TVA
- Operational capacity, source-reported
- 300 MW
- Planned capacity, source-reported
- 300 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Meta announces Gallatin campus expansion
- Operational
Campus officially launched November 2024 with six facilities on 900 acres
- Operational
Gallatin Municipal Planning Commission grants permission for 135,000 sq ft tent-based GPU cluster facility; Meta building multi-billion-dollar GPU clusters in rapid deployment structures to accelerate AI capacity
Underlying source
Source notes
Campus coordinates are city-centroid approximation for Gallatin, TN. Up to 12 data halls planned on 900+ acres per DPR Construction (general contractor). Meta is deploying AI GPU clusters in waterproof tent structures (rapid deployment structures) at this campus to accelerate capacity ahead of permanent building construction.
Third-party solar arrangement with TVA to match approximately 300 MW consumption; multiple PPAs including solar deals through TVA
Sources and provenance
- Meta brings data centers in tents to Gallatin, Tennessee · source retrieved 2026-07-06
- Tennessee has 60 data centers; Nashville probably has more than you think · source retrieved 2026-07-06
- Meta data center begins operations in Gallatin · source retrieved 2026-07-06
- Why is Gallatin giving Woolhawk a tax break? · source retrieved 2026-07-06
- Meta expands Gallatin data center — cooling & water approach · source retrieved 2026-07-06
- Meta Data Centers blog — Gallatin, we are online! · source retrieved 2026-07-25
- Gallatin offers a glimpse at hyperscale data center experiences · source retrieved 2026-09-09
- Meta Gallatin Data Center info sheet (PDF): $1.5B+ investment, 100+ operational jobs, TVA energy planning, water stewardship, 100% clean and renewable energy matching · source retrieved 2026-09-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.