SOURCE-LINKED U.S. REGISTRY

Meta Henrico Data Center (White Oak Technology Park)

Meta Platforms · Sandston, VA · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
37.4820177, -77.2337105
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Construction began October 2017 (DPR).

    Underlying source
  2. Operational

    RichmondBizSense describes an existing ~2.4M sq ft campus at 6200 and 7301 Technology Blvd built in phases from 2017.

    Underlying source

Source notes

Five-building 'H' campus of about 2.4–2.5M sq ft at full build-out, investment of over $1B (DPR), at 6200 and 7301 Technology Blvd. In 2022 a Meta-tied entity (Scout Development LLC) bought 475 acres at 3951 Portugee Road to the south for two more data centers ('Project Tropical'); the status of that expansion is not covered here. Coordinates are from the OSM feature 'Meta Henrico Data Center'.

DPR project page: campus runs on 100% renewable energy and enabled 700 MW of solar projects across Virginia; campus power capacity not stated.