Meta Huntsville Data Center Campus
Meta · Huntsville, AL · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 34.726, -86.647
- Serving utility, source-reported
- TVA
- Operational capacity, source-reported
- 487 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Meta (then Facebook) announces Huntsville campus; breaks ground on 970,000 sq ft facility
- Operational
Facility begins serving traffic
- Under construction
Two new buildings announced; campus to grow to 3.5 million sq ft
- Operational
Construction paused on portion of campus for AI-optimized design change; no cancellation; campus remains operational
Underlying source
Source notes
Address: 5400 Prosperity Dr NW, Huntsville, AL. The pin is approximate and does not mark the campus, which Baxtel places in the North Huntsville Industrial Park and the Huntsville Business Journal places "in north Huntsville near Toney." Original 2.5M sq ft campus operational; expansion to 3.5M sq ft paused December 2022 for AI architecture redesign; Meta stated no intent to abandon site. Over 85 grants and $4.2M in sponsorships to Huntsville-area schools since 2019. Meta's stated investment rose to more than $1.5B with the June 2022 expansion (original 2018 build ~$750M); the 3.5M-sq-ft expansion was later paused for AI redesign, so the ultimately realized figure is uncertain. Alabama's standard data-center abatement (Chapter 9B) likely applies, but no dollar figure was found in public sources. Status is operational: the 'expansion next to be stopped amid AI pivot' story dates from December 2022 and describes a temporary construction pause of a portion of the expansion pending a redesign; Meta explicitly did not cancel the project (unlike its Denmark site). The campus itself broke ground in 2018 and has been operating since 2021; Meta's current info sheet still describes operational buildings there. The operating campus and the paused expansion phase are two different things, and the campus is what is tracked here. The 2022 partial-expansion pause is context, not a status change. As of September 2026, no source published after 2022 was found stating that the paused portion has either resumed or been cancelled, so that phase's present state is unresolved. The Huntsville Business Journal (23 September 2026) repeats the June 2022 plan to add two buildings, "bringing the campus to nearly 3.5 million square feet", without saying whether that work resumed; a local group quoted in the article asked "what phase this development is in now."
PPAs include 377 MW solar through TVA (2018), 227 MW First Solar deal in Colbert County, AL, and 150 MW NextEra Energy in Lincoln County, TN
Sources and provenance
- Meta's Huntsville, Alabama, data center expansion next to be stopped amid AI pivot · source retrieved 2026-07-06
- Meta Huntsville Campus Data Center · source retrieved 2026-07-06
- Facebook parent company Meta invests $1.5 billion in Huntsville Data Center · source retrieved 2026-07-07
- Meta Huntsville Data Center info sheet (PDF) · source retrieved 2026-09-21
- Are More Data Centers Coming To North Alabama? What Local Leaders Are Saying · source retrieved 2026-09-28
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.