SOURCE-LINKED U.S. REGISTRY

Meta Sarpy Campus (Springfield expansion)

Meta · Springfield, NE · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.052, -96.148
Serving utility, source-reported
Omaha Public Power District (OPPD)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Initial campus buildings become operational in Papillion/Sarpy County

  2. Under construction

    Meta announces 9-building, 4 million sq ft expansion; acquires 500+ acres in Springfield south of Papillion campus; Springfield completion targeted end 2024 per 2022 announcement

    Underlying source

Source notes

Campus spans Papillion and Springfield, Sarpy County. Existing multi-building campus operational since 2019; ongoing expansion toward a 9-building, 4-million-sq-ft footprint. Meta has invested more than $1.5B at this site since 2017 (confirmed by DCD and multiple sources; a $2.5B total figure appeared in the record but was not supported by any cited source). Planned MW capacity of 2,000 was removed — no source confirms a MW figure for this campus. Springfield buildings were targeted for completion by end 2024; operational status of those buildings as of mid-2026 should be verified against a current source. Coordinates approximate for the Springfield expansion area; original Papillion buildings are slightly northeast.

Meta matches 100% of electricity use with renewable energy across all data centers

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.