SOURCE-LINKED U.S. REGISTRY

Massachusetts Green High Performance Computing Center

MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale) · Holyoke, MA · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
exact
Address as listed
100 Bigelow Street
Coordinates
42.20285, -72.60693
Serving utility, source-reported
City of Holyoke
Operational capacity, source-reported
15 MW
Planned capacity, source-reported
Not published
Source record updated
2026-10-24

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Opened 2012

    Underlying source

Source notes

90,300 sq ft, opened 2012, hydro-powered university research-computing consortium (100 Bigelow St). Explicitly exempted from Holyoke's 2026 data center ban. Houses the MIT Lincoln Laboratory Supercomputing Center (LLSC / TX-GAIA) — recorded as one facility, not two.

MIT CSAIL's facility page states a 15-megawatt utility connection from Holyoke Gas & Electric, "about 70% of which is sourced locally from hydroelectric facilities on the Connecticut River", and that MGHPCC shares a 34.5 kV bus with the Hadley Falls hydroelectric station. Recorded as source=grid rather than hydro because the supply is a utility connection with a majority - not exclusive - hydro mix.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory