SOURCE-LINKED U.S. REGISTRY

Microsoft Alviso Data Center Campus

Microsoft · San Jose (Alviso), CA · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
1657 Alviso-Milpitas Road
Coordinates
37.428, -121.977
Serving utility, source-reported
Pacific Gas and Electric Company
Operational capacity, source-reported
Not published
Planned capacity, source-reported
48 MW
Source record updated
2026-10-19

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Underlying source

Source notes

Microsoft's first self-owned/operated data center in San Jose. Groundbreaking June 10, 2026, target completion 2028. 64-acre site (1657 Alviso-Milpitas Rd), two-building campus. Distinct from the already-tracked Prologis San Jose records.

CEC Small Power Plant Exemption 19-SPPE-04 (exempted 2022-07-14) covers backup generation for this site: 224 renewable-natural-gas generators rated 0.45 MW each plus two diesel administrative generators of 1.25 MW and 0.5 MW, against a stated maximum electrical load of 99 MW and an estimated operational load of 77 MW.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory