SOURCE-LINKED U.S. REGISTRY

Microsoft Douglasville Data Center Campus

Microsoft · Douglasville, GA · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.7547, -84.7427
Serving utility, source-reported
Georgia Power
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Plans filed for four 245,000 sq ft technology facilities on 160-acre parcel at 1601 North River Road as part of Azure East US 3 region

  2. Under construction

    Phase I construction commenced; full Azure East US 3 cloud region launch targeted 2027

    Underlying source

Source notes

Four 245,000 sq ft technology facilities totaling ~980,000 sq ft on 160-acre parcel at 1601 North River Road, Douglasville. Part of Azure East US 3 region alongside facilities in East Point and Palmetto. Coordinates are Douglasville city centroid; actual site is northern Douglasville.

Grid-served by Georgia Power (the regulated utility). A secondary tracker reported ~144 MW critical / 216 MW total campus load, but the primary source could not be confirmed.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.