Microsoft Fairwater Atlanta (Azure AI Superfactory)

Microsoft · Fayetteville, GA · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.4487, -84.4549
Serving utility, source-reported
Georgia Power
Operational capacity, source-reported
Not published
Planned capacity, source-reported
1500 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Microsoft's Atlanta Fairwater AI datacenter began operation in October 2025 — the second in the Fairwater family; two-story, no UPS/gensets

    Underlying source

Source notes

615-acre, up-to-13-building QTS-built campus on Hwy 54W near Fayetteville, Fayette County (Microsoft's materials say 'Atlanta'). Began operation Oct 2025 as Fairwater 2 — a 'multi-gigawatt' AI campus. ~1,500 MW is the anticipated ultimate Georgia Power load across all buildings (planned figure; ~433 MW cited as initially online). Distinct from Microsoft's smaller Tyrone, GA campus. Two-story design with no UPS or backup generators. Coordinates are the Fayetteville area centroid. Microsoft has not disclosed tenant capex for the Fairwater Fayetteville space; the ~$1B/$6.5B figures are QTS developer build-out estimates for the full multi-tenant campus, and the widely-cited $14.5M abatement / $1.8B / $75M figures attach to different Microsoft/Fulton-County sites (the $75M was FCDA land-sale proceeds, not a subsidy to QTS) -> no investment figure is recorded.

Two-story design with no UPS or backup generators (DCD, Oct 2025) — no on-site generation. Microsoft states Fairwater uses improved closed-loop cooling that 'consumes almost zero water in its operation.' Georgia Power 2025 IRP testimony cites the QTS Fayetteville campus as a single load of just under 1,500 MW at full build-out.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.