Microsoft Malaga Campus
Microsoft · Malaga, WA · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Malaga Alcoa Highway
- Coordinates
- 47.23, -120.2
- Serving utility, source-reported
- Chelan County PUD
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 288 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Microsoft acquired 102.5 acres on Malaga Alcoa Highway for $9.2M across three parcels
Underlying source - Permitted
Permits filed for three data center buildings on Malaga Alcoa Highway; Chelan County
Underlying source - Under construction
Construction of first datacenter building commenced June 2023 per Microsoft Local blog; Jumpoff Ridge Substation also under construction on campus
Underlying source
Source notes
Three-building campus at 5375 Malaga Alcoa Highway; two additional buildings possible by 2027 on demand. As of July 2026, the 288 MW figure came from secondary aggregator Cleanview; as of October 2026, it also appears in Columbia Riverkeeper's February 2026 report, which lists Chelan County's data center capacity as 24 MW existing / 288 MW planned and says Chelan PUD agreed to supply up to 288 MW to Microsoft over a 15-year period, and in The Wenatchee World's report on the June 2025 power contract, which says the PUD's infrastructure will help provide up to 288 megawatts from 2026 to 2040; both describe it as power the PUD will supply. Primary sources (DCD, Microsoft) do not specify MW capacity. Construction of first building began June 2023 per Microsoft Local blog; the original status history incorrectly dated the under-construction status to 2024-05. Expected operational 2026. Coordinates approximate for Malaga area on Malaga Alcoa Highway. A Building-1 permit cites ~72 peak-shift staff (a single-building figure, not a facility employment total); no confirmed total campus capital-expenditure figure is public. As of 2026-08-08, no citable operational date exists. Microsoft's own Malaga project page gives a first-phase construction window concluding in early 2026 but states plainly that "Completion of construction does not indicate datacenter operation/availability", and publishes no energization or service date. Secondary reporting that the first building would be "powered in August and fully operational by late 2026" is forward-looking and does not change the status, which remains under construction. Microsoft's own Quincy/Central Washington community page states it "operates datacenters in Quincy and is developing new datacenters in Malaga and East Wenatchee" — positively confirming the site is not yet operational.
Carbon-free hydropower from Chelan PUD; 18 MW surplus hydropower through end of 2025, then long-term arrangement under utility energy marketing strategy. Under the June 2025 large-load contract, Microsoft will import new clean power from a third-party supplier for 2026-2040 (source undetermined); Chelan PUD is not obligated to serve its own hydropower. Microsoft funded the $86.5M Jumpoff Ridge substation.
Sources and provenance
- Microsoft Plans Three Data Centers in Malaga, Washington · source retrieved 2026-07-06
- Malaga Datacenter Project Overview · source retrieved 2026-09-05
- Microsoft Malaga Campus — 288 MW capacity profile · source retrieved 2026-07-06
- PUD commissioners approve power contract for Microsoft data center · source retrieved 2026-07-07
- Quincy Community — Microsoft Local · source retrieved 2026-08-08
- Chelan County PUD commissioners OK energy contract with Microsoft for Malaga data center buildings · source retrieved 2026-10-12
- A Closer Look: Columbia River Data Centers (February 2026) — Chelan County: 24 MW existing / 288 MW planned · source retrieved 2026-09-05
- Washington state grapples with the AI data center boom · source retrieved 2026-10-30
- Washington Utility District OKs $4M Investment in Microsoft Substation · source retrieved 2026-09-05
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.