Microsoft Pecos Data Center Campus

Microsoft · Pecos, TX · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
31.42, -103.49
Serving utility, source-reported
Chevron/Energy Forge One LLC
Operational capacity, source-reported
Not published
Planned capacity, source-reported
2000 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Microsoft announces 2 GW campus in Pecos as one of largest single capacity additions in company history. Five-to-seven-year build-out planned.

    Underlying source

Source notes

7,000-acre campus in Reeves County. Natural gas plant investment estimated at $7B separate from campus construction. No groundbreaking date reported as of July 2026; coordinates are Pecos city center as exact parcel not disclosed.

20-year PPA with Energy Forge One (Chevron subsidiary) for dedicated behind-the-meter natural gas plant (~$7B plant cost). GE Vernova and Caterpillar/Solar Turbines. Campus designed to eventually integrate with ERCOT regional grid.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.