- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 31.42, -103.49
- Serving utility, source-reported
- Chevron/Energy Forge One LLC
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 2000 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Microsoft announces 2 GW campus in Pecos as one of largest single capacity additions in company history. Five-to-seven-year build-out planned.
Underlying source
Source notes
7,000-acre campus in Reeves County. Natural gas plant investment estimated at $7B separate from campus construction. No groundbreaking date reported as of July 2026; coordinates are Pecos city center as exact parcel not disclosed.
20-year PPA with Energy Forge One (Chevron subsidiary) for dedicated behind-the-meter natural gas plant (~$7B plant cost). GE Vernova and Caterpillar/Solar Turbines. Campus designed to eventually integrate with ERCOT regional grid.
Sources and provenance
- Microsoft announces Pecos data center campus · source retrieved 2026-09-10
- Microsoft plans 2 GW data center campus in Pecos, Texas · source retrieved 2026-07-06
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.