Microsoft Tyrone Campus (Project Rita)

Microsoft · Tyrone, GA · United States

Facility record

Lifecycle
PermittedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.494, -84.588
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
96 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    DRI (Development of Regional Impact) application filed; project first surfaced publicly

    Underlying source
  2. Permitted

    Rezoning approved by Tyrone Town Council

    Underlying source
  3. Permitted

    Microsoft publicly confirmed the project via Microsoft Local blog; no site plan or building permits filed as of June 2 2026

    Underlying source

Source notes

Two-building campus (two 48 MW buildings = 96 MW, ~490,000-500,000 sq ft) plus an on-site substation; codename Project Rita. Part of Microsoft's East US 3 Azure region (planned 2027). Total site ~161 acres (~146.4 in Tyrone + ~14.5 in Fairburn). As of June 2 2026 no site plan or building permits filed. Microsoft requested no tax abatements (none offered). No investment figure disclosed. Coordinates approximate (address-derived; 2044 GA-74). Estimated ~4,000 gallons/day operational water use.

Utility not named in any public filing. Georgia Power is the incumbent Fayette County utility but is not source-confirmed for this project. Microsoft said it will pay for transmission/substation improvements and that costs should not transfer to residential ratepayers.