Middletown Data Center
Middletown Data Center LLC · Middletown, VA · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.0202984, -78.2907443
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 10 MW
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Operational
Described as a 43,000 sq ft facility in operation for over a decade. It applied for a CUP to expand onto a neighboring property and was not included in the grandfathering resolution.
Underlying source
Source notes
Operator specs: 14 MW total power, 10 MW critical IT, 43,416 sq ft of data center space. A Sept 2025 BZA variance allowed a supplemental backup generator. The coordinates are the OSM geocode of 8209 Valley Pike, the address listed by directories and not confirmed on a fetched primary page.
Sources and provenance
- Middletown Data Center — Technical Specifications · source retrieved 2026-10-14
- Data centers stripped as allowable use in Frederick County · source retrieved 2026-10-14
- Board of Zoning Appeals OKs variance for additional generator at existing data center · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.