Glassworks Data Campus (former Owens-Illinois glass plant)
Miles Brothers, LLC · Clarion, PA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 41.210335, -79.37146
- Serving utility, source-reported
- FirstEnergy (West Penn Power)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 700 MW
- Source record updated
- 2026-10-15
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Conceptual marketing plan. No formal proposal submitted to the county planning commission.
Underlying source
Source notes
49 South Sheridan Drive, Clarion Borough. Phase 1 is about 100 acres with four two-story buildings (1.6M+ sq ft), plus 85 acres for a later phase. Clarion Borough adopted a data center ordinance Jan. 20, 2026. Depends on securing a tenant. The pin is a census geocode near the site.
Immediate access to 100 MW via an on-campus 138-kV substation. Scaling to 700 MW would depend on more grid power and optional on-site generation.