MillCompute Bates Mill No. 3 AI Data Center
MillCompute LLC · Lewiston, ME · United States
Facility record
- Lifecycle
- CancelledSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 35 Canal Street
- Coordinates
- 44.0970175, -70.2183307
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 24 MW
- Source record updated
- 2026-10-04
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
MillCompute LLC proposed a $300M Tier III AI data center occupying the first two floors of Bates Mill No. 3
Underlying source - Cancelled
Lewiston City Council voted unanimously (7-0) to reject the proposal after public backlash over power/water use and a requested 20-year tax break
Underlying source
Source notes
Proposed to occupy the first two floors (~85,000 sq ft) of Bates Mill No. 3; estimated 20-30 jobs and $300M investment; included a 20-year TIF (90% tax return years 1-10, 85% years 11-20). Phase 2 contemplated an on-site natural gas co-generation system. Rejected unanimously by the Lewiston City Council on 2025-12-17 after sustained public opposition over water/power use and the tax break request.
Initial power from the grid (Central Maine Power service territory); phase 2 planned an on-site natural gas co-generation system.
Sources and provenance
- Lewiston mill $300M AI data center · source retrieved 2026-10-04
- Lewiston city council shoots down data center proposal · source retrieved 2026-10-04
- Tier III AI data center proposed for Lewiston Bates Mill · source retrieved 2026-10-04
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.