Mudiita Ransom Township Data Center Campus
Mudiita Land Venture LLC · Ransom Township, PA · United States
Facility record
- Lifecycle
- CancelledSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 41.4483, -75.7375
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 750 MW
- Source record updated
- 2026-08-17
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Mudiita Land Venture acquired ~530 acres south of Ransom Road and west of South Keyser Avenue from KF Real Estate for $2.4 million; Mudiita Infra advertised a 930-acre, 750 MW phased campus.
Underlying source - Cancelled
Listed incorporator Sinha Shatrughan told WVIA 'Personally, I didn't want to go ahead with any sort of data center there right now'; the Mudiita Infra websites are deactivated.
Underlying source
Source notes
Announced and effectively abandoned within the same month (July 2026). Part of the property may instead be used for the Old Forge Pumped Storage Project, filed with FERC on July 7, 2026 by Renewable Energy Aggregators Inc. Recorded as cancelled because the named incorporator disclaimed any intent to proceed and the project's marketing sites were taken down; no formal withdrawal filing was located.
Mudiita Infra's (now deactivated) website described an all-electric campus using battery energy storage and solar infrastructure without relying on gas power.
Sources and provenance
- Ransom Township Could Host 930-Acre Data Centre Campus · source retrieved 2026-08-17
- Future of Ransom Twp. property uncertain as Carbon County developer says 'no plans' for data center campus · source retrieved 2026-08-17