SOURCE-LINKED U.S. REGISTRY

Nebius Birmingham AI Factory (BHM01)

Nebius Group · Birmingham, AL · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.4556, -86.8131
Serving utility, source-reported
Alabama Power
Operational capacity, source-reported
Not published
Planned capacity, source-reported
300 MW
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Permitted

    Land acquisition closed: ~75 acres at Milan Pkwy / Venice Rd acquired for $90M via affiliate Alabama ADC Holdings LLC

  2. Permitted

    Building permit BLD2026-00195 filed; project grandfathered before Birmingham's proposed data-center moratorium

  3. Under construction

    First construction permits issued (~$855M under contract); Hoar Construction begins work

Source notes

Nebius Group's Birmingham AI Factory (site code BHM01); distinct from the Nebius Vineland Data Center and the Nebius AI Factory (Independence). Capacity phased: Phase I = 100 MW (targeted H2 2026), Phase II adds 200 MW (full 300 MW by 2027-2028). Land acquisition $90M confirmed (2025-09-30); ~$855M in construction permits issued (April 2026) with $2.1B more under review; total capex described as 'tens of billions' (a projection) - so no investment figure is recorded. Reported job figures vary: BirminghamWatch (April 2026) reported Nebius representatives saying the AI factory would provide more than 100 jobs; Bham Now (May 2026) reported that officials said the center would employ approximately 100 people; al.com, republished by GovTech (September 2026), reported 78 jobs. No permanent-job count is recorded because the reported figures conflict and two of them are approximate or open-ended. Nebius's own Birmingham page says in one place that the project will create 1,000+ skilled construction jobs and in its FAQ that it will create hundreds. Site: former Regions Lakeshore Operations Center (about 75 acres per Nebius's project page, Yellowhammer News and GovTech; Baxtel lists 80) acquired from UAB, Regions Bank, and U.S. Steel; general contractor Hoar Construction. Coordinates address-approximate (201 Milan Pkwy, Oxmoor Corporate Park).

Alabama Power (APCO) confirmed as utility per Nebius's official page; APCO to build new switching/substation infrastructure funded by Nebius.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.