SOURCE-LINKED U.S. REGISTRY

Sanford Woods Data Center

New England Energy · Sanford, ME · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
43.4387179, -70.7746224
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Reported capacity range is 100-300 MW (not a firm committed figure; not recorded as capacity pending a formal filing). Proposed as one component of the 1,060-acre 'Sanford Woods Industrial and Technical Campus' in south Sanford, bisected by the Mousam River, on land owned since 1975 by the Gibbs family's New England Energy (Randy Gibbs, founder of Multifuels of Houston, TX; co-developer Walt Bussells). Co-located with a planned 300 MW hydrogen fuel-cell power plant (as of October 2026, tracked separately as Sanford Woods Hydrogen Fuel Cell Power Plant), a 50-acre industrial greenhouse, and a cold-storage facility. Cumulative campus investment reported at ~$2.16 billion (a tally by Sanford City Manager Steve Buck, as reported by the Sanford Springvale News) with ~100 long-term jobs for the project as a whole (State Sen. Matthew Harrington's figure, as reported by the same paper) -- both figures span the whole campus, not the data center alone, so they are not recorded as this facility's investment or jobs. No land area is recorded, because the 1,060-acre parcel is the whole campus, not the data center's footprint alone. Disclosed to the Maine Legislature's Energy and Utilities Committee in February 2026; marketing, partner selection, financing and permitting expected to take ~2 years. Maine's 2026 data-center moratorium debate would allow continued groundwork but block new construction permits before 2028.

Planned to be powered off-grid by on-site generation: a hydrogen fuel-cell plant (initially natural gas, transitioning to hydrogen within ~5 years) plus solar.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory