Nexus Hubbard Data Center & Power Campus
Nexus Data Centers · Hubbard, TX · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 31.824001, -96.776243
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 612 MW
- Source record updated
- 2026-08-25
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Nexus reached Final Investment Decision (FID) for Phase 1 after securing financing led by Eagle Point Credit Management; the project has advanced from pre-NTP development to FID and construction continues, per Aug 19 2026 reporting.
Underlying source
Source notes
612 MW first-phase data center campus on ~2,000 acres on the outskirts of Hubbard (Hill County), between Highway 171 and County Road 3369; behind-the-meter natural gas generation. Led by CEO/managing partner Ivan Van der Walt. TCEQ air permit applications filed Dec 2025 (183046, PSDTX1700, GHGPSDTX269); ~500 MW targeted online late 2026; publicly stated eventual full-buildout target ~7.7 GW. No end-user customer publicly identified. Coordinate anchored on the city of Hubbard; exact parcel not confirmed.
Behind-the-meter natural gas: application identifies 55 combustion turbines / reciprocating engines for continuous operation plus 6 emergency-standby diesel generators. Publicly stated full-buildout target ~7.7 GW.
Sources and provenance
- 600MW natural gas-powered data center campus proposed in Hubbard, Texas · source retrieved 2026-07-14
- Nexus Data Centers — Hubbard Data Center & Power Project, Hill County TX · source retrieved 2026-07-14
- Nexus Hubbard Campus (612 MW) listing · source retrieved 2026-07-14
- Nexus proposes 612MW campus (Dec 2025 TCEQ filing) · source retrieved 2026-07-14
- TCEQ Air NSR — Nexus applied air permits 183046, PSDTX1700, GHGPSDTX269 (per Dec 2025 filing) · source retrieved 2026-07-14
- Lake Lander — Citizens voice concerns about Nexus data center negotiations · source retrieved 2026-07-26
- Nexus Data Center Project in Hubbard, Texas Reaches FID as Construction Advances · source retrieved 2026-08-25
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.