Old Ocean Data Center
Nightpeak Energy · Old Ocean, TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 29.0799726, -95.749673
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 620 MW
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Two 310 MW hyperscale data centers ($1.5B each) on 158 acres near Sweeny. Nightpeak's site cites an ability to energize from 2027.
Underlying source
Source notes
The investment figure covers the two data centers only ($1.5B each). The $3.5B headline also includes two $250M power plants. The 158-acre site is shared with the Bulldog Power plants. Coordinates are the Old Ocean community point near Sweeny, not the parcel.
Co-located with Bulldog Power, a Nightpeak combustion turbine project described as two 310 MW plants. Bulldog has been in development since 2023 and targets operation in 2028 or earlier.
Sources and provenance
- Houston-Area County Rejects Tax Break For $3.5B Data Center Project · source retrieved 2026-10-14
- OpenStreetMap Nominatim geocode: Old Ocean, Brazoria County, TX · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.