Nodiac Albertville Modular Data Center (70th St NE & Karment Ave NE)
Nodiac · Albertville, MN · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 45.2347086, -93.6642199
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 20 MW
- Source record updated
- 2026-11-02
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Concept review before Albertville City Council; no formal decision; data centers not currently allowed under city code
Underlying source
Source notes
Site is at the intersection of 70th Street and Karment Avenue NE, next to a Wright-Hennepin electrical substation, on a newly created 3.66-acre parcel. Nodiac estimates 20 MW across 20 modular data center modules, 10 transformers and 30 equipment pads. Water would be trucked in, about 30,000 gallons on a 5-8 year cycle. The site would be unmanned apart from one on-call maintenance job. The location is the Albertville city centroid.
Sources and provenance
- Albertville City Council hears data center concept, approves preliminary tax levy · source retrieved 2026-11-02
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.