North Campbell Land Co. Hopkinsville 50 MW Data Center

North Campbell Land Co. (Sphere 3D) · Hopkinsville, KY · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
36.8657852, -87.489412
Serving utility, source-reported
Hopkinsville Electric System (HES)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
50 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

A proposed second Hopkinsville facility, separate from the operator's existing ~15 MW bitcoin mine at the Holland Substation. The location, footprint, construction cost and development schedule have not been disclosed, so the coordinates are the Hopkinsville city centroid and are approximate only — the actual site is unknown. A draft Hopkinsville zoning amendment developed after this proposal surfaced would prohibit 'hyper-scale' facilities of 75 MW or more and set setbacks by size class; a special-called public hearing was held July 27, 2026.

The company says it would cover the estimated $8–10 million cost of a new 65 MW HES substation, with roughly 15 MW of that capacity available to other HES customers.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.