Deep Park Data Center (North Port 300)

North Port Holdings 300 LLC (end operator undisclosed) · North Port, FL · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
27.0677773, -82.0743791
Serving utility, source-reported
Florida Power & Light
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-20

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Site and development plan application received by the City of North Port; city awaiting applicant response to sufficiency-review deficiencies.

    Underlying source

Source notes

Seven data center buildings totaling ~896,000 sq ft (incl. ~123,200 sq ft office) on ~112 acres within the 282-acre 'Deep Park' master concept (Activity Center 6) north of I-75 and south of Yorkshire Street. Applicant LLC is registered to Valley Stream, NY; end tenant is under NDA. Application filed 2026-07-20; ~22.5 acres of stormwater ponds and 4.14 acres of wetland impacts per filings.

FPL is the electric provider per the filings. FPL has not confirmed that the project has begun large-load review. A future substation is planned as a separate submission, and no definitive electrical load is stated.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.