NorthMark Strategies Spartanburg High-Performance Computing Center

Valara Holdings (NorthMark Strategies) · Spartanburg, SC · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
4000 South Pine Street
Coordinates
34.923066, -81.851905
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
450 MW
Source record updated
2026-10-27

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Facility in development at the former Kohler manufacturing plant in Spartanburg County; slated to go online later in 2026.

    Underlying source

Source notes

Adaptive reuse of the former Kohler manufacturing facility in Spartanburg County, developed by NorthMark Strategies through its subsidiary Valara Holdings. This is a DIFFERENT Spartanburg County site from the tracked Greenidge record at 300 Jones Road. Coordinates are an approximate geocode of the South Pine Street address reported in local coverage; no parcel-level source was retrieved. Subsidies checked 2026-09-10: Spartanburg County Council approved a tax incentive package for the project, but the article does not give a FILOT dollar figure or program name -- only projected resulting property-tax revenue ($10.5M in 2026 rising to $15M/yr 2029-2045). Not filing a structured subsidies entry since no incentive amount is stated; flagging for a follow-up pass that can find the actual FILOT ordinance.

The project is being built with on-site power generation rather than drawing the full load from the local grid. NorthMark applied to the S.C. Department of Environmental Services on 2026-03-04 for 'additional equipment to support increased power generation capacity' at the site; the application was under technical review as of April 2026.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.