NorthPoint Fairfield Data Center (Vanden Road Industrial Campus)

NorthPoint Development · Fairfield, CA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
38.2898329, -121.9607882
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
150 MW
Source record updated
2026-09-12

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

300-acre industrial campus between Vanden Road and North Gate Road in northeast Fairfield, near the Vacaville border. The Fairfield Planning Commission approved a master development permit for a 4.6-million-sq-ft industrial park here in 2023; the 150 MW data-center figure comes from developer/broker (Jones Lang LaSalle and NorthPoint) presentation materials for a data center within that park, and no data-center-specific application had been filed as of this reporting. Canon Partners (itself controlled by Andrews Lando & Associates and Stroud Properties) is also named as a co-developer. PG&E began an infrastructure/engineering cost study around Q3 2025 and issued an engineering agreement in December 2025. A public hearing would still be required before any data-center-specific approval. Coordinates are geocoded to Vanden Road in Fairfield only (no confirmed parcel or street address), so treat the pin as a rough area marker.