Shakopee Hyperscale Data Center Campus (NorthStar Digital Infrastructure)

NorthStar Digital Infrastructure LLC · Shakopee, MN · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
44.7980186, -93.5268986
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
80 MW
Source record updated
2026-11-02

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    EAW submitted to MPCA; EAW deemed complete 2025-12-02; public comment closed 2026-02-15 with 118 comments

    Underlying source

Source notes

Phased campus of four buildings totaling about 1.2 million sq ft on 160 acres. Phase 1 is two buildings with 80 MW of critical IT load. Plans include backup diesel generation, a cooling water system and a new substation. Estimated cost is $2.8 billion. Air permit application was targeted for 2026-06-01 and DNR water appropriation permit for 2026-09-01. No street address was published. The location is the Shakopee city centroid.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.