Novva San Francisco (400 Paul Avenue)
Novva Data Centers · San Francisco, CA · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 400 Paul Avenue
- Coordinates
- 37.72315, -122.398467
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 9 MW
- Planned capacity, source-reported
- 36 MW
- Source record updated
- 2026-09-21
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Permitted
Approved by the San Francisco Planning Commission in 2016 (Mission Local).
Underlying source - Operational
First 9 MW phase came online in summer 2026 as part of a planned 36 MW facility; expansion continues through 2028 per Mission Local.
Underlying source
Source notes
182,000 sq ft data hall plus 56,000 sq ft office/operations building in Bayview's industrial corridor, across Paul Avenue from Digital Realty SFO10 / 200 Paul Avenue. 36 MW is planned critical load; 9 MW operational as of summer 2026.
Sources and provenance
- Novva — San Francisco data center (36 MW critical load, 182,000 sq ft data hall, 7.5-acre campus) · source retrieved 2026-09-21
- Amid rising fear over data centers, an S.F. supervisor quietly plans a moratorium (2026-09-10) · source retrieved 2026-09-21
- San Francisco weighs 45-day freeze on data centers as Bayview feels the heat (2026-09-11) · source retrieved 2026-09-21
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.