Novva West Jordan Campus
Novva Data Centers · West Jordan, UT · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.57389, -112.04576
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- 200 MW
- Planned capacity, source-reported
- 175 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy, for a structural reason rather than a search miss. West Jordan's Redevelopment Agency lists six active project areas, all bounded well east of this campus; under Title 17C an agency may only act within a designated project area, so no participation agreement is available at this location under the current project-area map. The city's own 2025 post on the expansion discusses tax value in generic terms and names no incentive or agreement.
Novva's own facility page describes a centralized 200MW on-campus substation with N+1 redundancy serving the four-phase campus, plus a planned 15MW-30MW of on-site solar. The 175MW figure is the campus's stated total data center capacity at four-phase completion; the 200MW is substation capacity, not IT load.
Sources and provenance
- Novva Data Centers — Utah Data Center, 100-Acre SLC Colocation Campus · source retrieved 2026-09-21
- Novva and CIM Group land $2 billion loan to complete a 175MW AI data center in West Jordan, Utah · source retrieved 2026-08-14
- Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026) · source retrieved 2026-08-14
- West Jordan Redevelopment Agency — active project areas and boundaries · source retrieved 2026-09-04
- Utah's massive data centers seek to build new power sources · source retrieved 2026-10-13
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.