Dahlgren West Data Center Campus
Oasis Digital Properties · Dahlgren, VA · United States
Facility record
- Lifecycle
- PermittedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 38.3385746, -77.0782376
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Potomac Development Group proposed a ~500-acre, ~9M sq ft campus off U.S. 301.
Underlying source - Permitted
King George Board of Supervisors unanimously approved Oasis's 485-acre, 10-building plan.
Underlying source
Source notes
10 buildings totaling about 6.8M sq ft on the north side of James Madison Parkway. The developer projects 1,500 construction jobs and 50–60 permanent jobs per building. The site has access to 230 kV transmission. The coordinates are an approximate point on James Madison Parkway near Walnut Hill, not the parcel.
Sources and provenance
- NoVA-based data center company building new campus near Fredericksburg · source retrieved 2026-10-14
- Developer Proposes 9M SF Data Center Campus In Virginia · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.