Oppidan Cedar Rapids Data Center

Oppidan · Cedar Rapids, IA · United States

Facility record

Lifecycle
PermittedSource-reported lifecycle
Location precision
approximate
Address as listed
1515 33rd Avenue SW
Coordinates
41.9439273, -91.6736877
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
10 MW
Source record updated
2026-09-16

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Permitted

    Cedar Rapids confirmed the project after building permits were filed; the site has been zoned light industrial since the early 2000s, so a data center is a permitted use and no public hearing is required.

    Underlying source

Source notes

Just north of Highway 30 on the southwest side. Over 98,000 sq ft, no city incentives, construction expected to start in fall 2026 or early spring 2027 depending on equipment availability. Permit documents name the applicant entity as CLOP Cedar Rapids, IA LLC. The Gazette reports the facility is intended for networking, signal boosting and storage rather than AI training or inference, so no AI classification is recorded — the existing classification options cannot express 'assessed, not AI.' Oppidan built a comparable 60,000 sq ft, 5 MW facility in Des Moines in 2024, which is tracked separately as of September 2026.