SOURCE-LINKED U.S. REGISTRY

Paradox Data Union County Campus

Paradox Data LLC (definitive agreement for acquisition by Z Squared Inc.) · El Dorado, AR · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
713 Industrial Road
Coordinates
33.207042, -92.6137253
Serving utility, source-reported
Entergy Arkansas
Operational capacity, source-reported
Not published
Planned capacity, source-reported
150 MW
Source record updated
2026-10-18

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Z Squared signed a definitive agreement to acquire 100% of Paradox Data. Milestones run from initial AI compute energization to 50/100/150 MW.

    Underlying source

Source notes

About 8 MW is already energized. Entergy told the Democrat-Gazette Paradox is not a data center. Closing of the Z Squared deal was not confirmed. Coordinates were geocoded from the street address.

Existing interruptible Entergy service arrangement for up to 8.0 MW. The development target is up to 150 MW from utility power plus on-site generation.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory