Paradox Data Union County Campus
Paradox Data LLC (definitive agreement for acquisition by Z Squared Inc.) · El Dorado, AR · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 713 Industrial Road
- Coordinates
- 33.207042, -92.6137253
- Serving utility, source-reported
- Entergy Arkansas
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 150 MW
- Source record updated
- 2026-10-18
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Z Squared signed a definitive agreement to acquire 100% of Paradox Data. Milestones run from initial AI compute energization to 50/100/150 MW.
Underlying source
Source notes
About 8 MW is already energized. Entergy told the Democrat-Gazette Paradox is not a data center. Closing of the Z Squared deal was not confirmed. Coordinates were geocoded from the street address.
Existing interruptible Entergy service arrangement for up to 8.0 MW. The development target is up to 150 MW from utility power plus on-site generation.
Sources and provenance
- Florida-based firm details plans for El Dorado data center · source retrieved 2026-10-18
- Z Squared Inc. Signs Definitive Agreement to Acquire 100% of Paradox Data and Its Union County Campus · source retrieved 2026-10-18
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.