St. Georges Business Park & Lighthouse Farms

Parkway Gravel Inc. · St. Georges, DE · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
39.5593065, -75.6542782
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
300 MW
Source record updated
2026-10-01

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Revised site plan filed for St. Georges Business Park & Lighthouse Farms at 3.2 million sq ft (up from an original 2.5 million sq ft / three distribution buildings + 150 homes). The developer's engineering firm, Verdantas, told the county the zoning allows 'distribution centers, fulfillment centers, truck terminals, warehouses, and data centers' on the parcel.

    Underlying source

Source notes

Confidence is rumored rather than reported because sources disagree on whether the ultimate use will be a data center: county filings and press describe a mixed-use industrial park (distribution/fulfillment/warehouse) for which Delaware zoning also happens to permit data centers, and coverage attributes to the developer's engineering firm only that 'the developer may be planning to build a data center' — not a confirmed data-center project. A Delmarva Power internal project list obtained via FOIA (Technical.ly) separately lists a 300 MW 'St. Georges/Frightland Area' project 'pending cluster study analysis'. That project is treated here as the same site given the shared name and geography, though the FOIA-based list does not itself name Parkway Gravel Inc., so the 300 MW planned figure carries that caveat. The square footage progression (2.5M sq ft → 3.2M sq ft) is not recorded separately because it describes the broader mixed-use park, not a confirmed data-center footprint. The pin is approximate: it is geocoded to the unincorporated place of St. Georges, DE (OSM); some press coverage instead characterizes the site as 'in Middletown' given proximity. The specific parcel south of the C&D Canal off US Route 13 did not resolve via geocoding.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.