Patmos Independence Data Center (2500 S. Little Blue Parkway)
Patmos · Independence, MO · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 2500 South Little Blue Parkway
- Coordinates
- 39.057, -94.353
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 100 MW
- Source record updated
- 2026-11-02
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Building permit application for 100 MW and 285,000 sq ft. A council vote on the lease assignment from NorthPoint was postponed to Nov 2, 2026.
Underlying source
Source notes
The initial phase is 17.5 MW with six muffled backup generators, in a warehouse in the EastGate Commerce Center. The project was grandfathered ahead of the city's moratorium.
Sources and provenance
- Independence City Council postpones decision on 2nd data center project in Little Blue Valley · source retrieved 2026-11-02
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.