Percheron Data Center

Rowan Green Data (DBA Rowan Digital Infrastructure) · Boardman area (Tower Road), OR · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
exact
Address as listed
Not published
Coordinates
45.7113177, -119.8262349
Serving utility, source-reported
PacifiCorp
Operational capacity, source-reported
Not published
Planned capacity, source-reported
300 MW
Source record updated
2026-09-10

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Rowan Digital Infrastructure (formerly Rowan Green Data, a Quinbrook/Birch Infrastructure JV) is developing a single unified campus on a 275-acre parcel in Morrow County, OR: four buildings totaling 1.125M sq ft, 300MW planned capacity by mid-2027. County approved rezoning Sept 2023 (East Oregonian, DCD). This is the canonical record for the campus; OSM ids 1501824327/328/329 are near-identical coordinates (within ~0.2km) almost certainly representing OSM nodes for the same single campus/buildings and, as of September 2026, are not listed separately. As of 2026-08-08, Rowan's own portfolio page states "300 MW" on "275AC" with phased buildout completing by 2030. Public reception, as of 2026-09-10: a Gov. Tina Kotek data-center land-sale cancellation reported elsewhere concerns a different project near Salem, OR (developer Verrus), not Percheron/Morrow County, and is not attributed to this record. No community reaction, hearing, or official statement specific to Percheron/Boardman was found; baxtel.com's project page states only that the project is under construction with planned 2027 completion.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.