ZeroC / Petawatt Holdings Data Center Site (417 County Route 42)

ZeroC Data Centers LLC (majority-owned by Petawatt Holdings, Inc.) · Massena, NY · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
417 County Route 42
Coordinates
44.953, -74.86
Serving utility, source-reported
Massena Electric Department (MED)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
200 MW
Source record updated
2026-09-21

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Massena Town Planning Board approved (4-0) the site plan for a ~$30M substation at 417 County Route 42 intended to serve a future data center; applicant said the site is 'currently a 200 Megawatt site' and would start construction within 60 days of approval

    Underlying source

Source notes

Site preparation (brush clearing) and a ~$30M substation were approved in Feb 2025 to hold a NYISO queue position; the deed is in ZeroC Data Centers' name with Petawatt as majority shareholder. Applicant estimated a ~900,000 sq ft building and an employment ratio of 40–60 people per 100 MW, and offered to guarantee no cryptocurrency mining. Two containers of crypto mining were on the parcel at the time. NYISO queue shows a 200 MW request (#1213, 2021) and a later 300 MW request (#1731, March 2025) at the Dennison 115 kV substation. As of September 2026, no building application had been found. Coordinates are a road-level geocode of County Route 42 near Dennison Road, not a confirmed parcel point.

Applicant told the planning board the substation would sit in MED service territory, interconnecting via the Dennison 115 kV substation (NYISO queue #1213/#1731).