PowerHouse Grand Prairie Campus

PowerHouse Data Centers · Grand Prairie, TX · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
32.62, -97.02
Serving utility, source-reported
Oncor
Operational capacity, source-reported
Not published
Planned capacity, source-reported
1800 MW
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    PowerHouse and Provident developing a 1.8 GW campus in the DFW area (Grand Prairie): 24 buildings across three phases, 1.8 GW switchyard

    Underlying source

Source notes

1.8 GW DFW-area campus (Grand Prairie): 24 buildings across three phases with an on-site 1.8 GW switchyard. Grand Prairie spans Dallas/Tarrant/Ellis counties; the campus is in the Ellis County (southern) portion. Coordinates reflect the southern Grand Prairie / Ellis County zone. Provident cited 'at least $5B in direct construction impact' over the multi-year build-out (Bisnow) and ~$300M for one 360,000-sq-ft building (Dallas Innovates) - neither a confirmed campus capex pledge -> no investment figure is recorded. Ellis County adopted Chapter 312 abatement guidelines (~Oct 2025, $50M threshold); no executed abatement agreement for this campus was found.

On-site 1.8 GW switchyard; ERCOT approved the first 500 MW tranche. Provident CEO Leon Backes said the company spent 'the past two years working closely with ERCOT and Oncor.' Oncor is Ellis County's incumbent transmission/distribution utility.