PowerHouse Caldwell County Data Center
PowerHouse Data Centers · Uhland, TX · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 29.87, -97.85
- Serving utility, source-reported
- Bluebonnet Electric Cooperative (via Tract's Caldwell Valley Technology Park interconnection; LCRA also named for the park)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Within the larger Caldwell Valley Technology Park megasite near Austin/San Antonio - a distinct operator/parcel from Tract's own land holding in the same park (1,515 acres bought in May 2025 and expanded to nearly 3,000 acres in January 2026; Tract Caldwell Valley Technology Park, tracked separately as of July 2026); the two should not be conflated. As of October 2026, no cited source states a capacity for PowerHouse's own site: the 4 GW figure is Tract's for the whole park, so it is not recorded as capacity. PowerHouse has filed a petition to move the site from Town of Uhland jurisdiction to Caldwell County jurisdiction (lighter TX zoning authority at the county level). Coordinates are approximate.
PowerHouse's own power arrangement is not separately disclosed — the company has not published its power source for this site, and its site-plan filing with Uhland reportedly omitted power-usage specifications.
Sources and provenance
- PowerHouse looking to build 500-acre data center near Austin, Texas · source retrieved 2026-07-09
- PowerHouse plans Austin suburb data center, moves to skirt city control · source retrieved 2026-07-09
- 500-Acre Texas Data Center Project Eyed by PowerHouse (Baxtel) · source retrieved 2026-08-16
- Tract Data Center Technology Park — Central Texas Data Center Tracker (Bluebonnet/LCRA/gas pipeline detail) · source retrieved 2026-07-24
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.