Project Arrowhead (Premier Data Center Development Irwin County Campus)
Premier Data Center Development, LLC · Mystic, GA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 31.6224192, -83.3351929
- Serving utility, source-reported
- Georgia Power
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1250 MW
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Development of Regional Impact application filed with the Georgia Department of Community Affairs.
Underlying source
Source notes
Five-building campus totalling 4.22 million sq ft on approximately 1,000 acres outside Mystic. First phase targeted 2030, full build-out 2034. The $6bn figure is stated as an upper bound ("up to $6 billion"), not a committed investment. Part of the land was previously earmarked for the Irwin Forward Tech Park proposal, withdrawn in March 2026. A DRI filing is a review trigger, not an approval — no rezoning or interconnection award is confirmed. Coordinates are the Mystic community centroid (OSM Nominatim), not a parcel.
Georgia Power is conducting an energy study for the project; no interconnection agreement is reported.
Sources and provenance
- Plans Filed for 1.2GW Data Center Campus in Irwin County, Georgia · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.