Avondale Campus
Prime Data Centers · Avondale, AZ · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.44, -112.35
- Serving utility, source-reported
- Salt River Project (SRP)
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 240 MW
- Source record updated
- 2026-09-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Groundbreaking on first 3 buildings.
Underlying source
Source notes
5-building, 66.5-acre campus; groundbreaking on first 3 buildings May 2026.
Sources and provenance
- Prime Data Centers breaks ground on three buildings at its 240MW Phoenix campus, advancing $3 billion investment in Avondale · source retrieved 2026-09-10
- Prime Data Centers PHX01 tech sheet — spec table: 'UTILITY PROVIDER SRP', 'ACRES 66.5', 'CRITICAL IT LOAD 240MW'; 'a closed-loop cooling system engineered for zero process water use during operations' · source retrieved 2026-08-31
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.