Prime Data Centers Starpointe Campus
Prime Data Centers LLC · Hanover Township, PA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.421072, -80.4645098
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-15
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Conditional use permit hearings under way. DEP reviewing the air permit for the power plant. Construction targeted for early 2027.
Underlying source
Source notes
About 1.8M sq ft across seven buildings on pre-graded pads in Starpointe Business Park. About 155 acres under contract from ALTIAN Development LLC. 'Several hundred million dollars' investment. The pin is the township centroid.
350 MW natural gas plant with a lateral to the Rover Pipeline, independent of the local grid.
Sources and provenance
- Developer details expansive Starpointe data center proposal · source retrieved 2026-10-15
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.