Prime ORD Chicago Campus
Prime Data Centers · Elk Grove Village, IL · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 1600 East Higgins Road
- Coordinates
- 42.0224688, -87.9621839
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 175 MW
- Source record updated
- 2026-09-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Official groundbreaking ceremony for ORD-01, the first of three planned campus buildings.
Underlying source
Source notes
Site-level figures, not entity-wide: the $1B and 175MW are stated for this Elk Grove Village campus at full build-out across three buildings; first building ORD-01 is 384,000 sq ft and up to 72MW. Status reflects the most recent sourced stage (2022 groundbreaking) — no fetched source confirms a live date, so this may lag reality. Distinct from the tracked TA Realty Elk Grove Village site (different operator, different parcel/acreage). Coordinates geocoded from the published street address.
Sources and provenance
- Prime Data Centers Breaks Ground on $1B Chicago Data Center Campus in Elk Grove Village · source retrieved 2026-09-10
- Prime Data Centers — Chicago data center campus · source retrieved 2026-08-31
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.