Project Ruby (Upatoi Data Center Campus)
Undisclosed end user (site pursued by Choose Columbus / Development Authority of Columbus) · Columbus, GA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.5487503, -84.7399283
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 600 MW
- Source record updated
- 2026-09-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Columbus Council voted 6-2 to create a technology overlay district in the Unified Development Ordinance. A separate rezoning request for the site has not been submitted, and a DRI review is still required.
Underlying source
Source notes
865 acres in northeast Muscogee County (Upatoi), $5.18 billion, 600 MW — a draw exceeding current power usage for all of Columbus. Columbus Water Works is named as the treated-water supplier. The overlay-district vote is a zoning tool, not project approval. Coordinates are approximate to Upatoi.